Zhuhai JGalaxy Temperature Control Technology Co., Ltd
电 话:xxxx-00000000
传 真:xxxx-000000
邮 箱:xxxxx.cn
地 址:xxxxxxxxxx
R&D Test Center
High quality system temperature control solution provider
The enthalpy difference test is conducted in a standard enthalpy difference laboratory according to the GB/T7725-2004 standard for room air conditioners.The main testable projects include the following:√ Stable state rated cooling and heating (T1, T2, T3 operating conditions);√ Customized heating with electric heating capacity; √ Unsteady state test for low-temperature and ultra-low temperature heating;√ Electric heating test;√ Maximum operating cooling (heating) test;√ Minimum operating cooling (heating) test;√ Removal of condensed water;√ Freeze;There are four types of measurable models: (1) split type, (2) window type, (3) cabinet type, and (4) duct fan.
The drop test is conducted using a standard drop machine, in accordance with the GB/T 2423.8-1995 standard and ASTM D 4169.The way of falling is free fall with one corner, three sides, and six sides.The measurable drop height is 1.2m.Drop testing is mainly used in product packaging design to confirm whether the packaging can meet the product protection requirements.
The cardboard box compression test is conducted using a standard compression machine according to GB6543 standardThe maximum measurable area is 1m × 1m, and the maximum measurable height is 1.2mThe compressive strength test of cardboard boxes is mainly used to simulate the pressure of heavy objects on cardboard boxes during stacking and transportation, in order to test whether the compressive strength of cardboard boxes can meet the requirements
Safety performance testing mainly includes withstand voltage testing, insulation resistance testing, grounding resistance testing, etc.The safety performance test is conducted according to the IEC60950 standard.The testing scope includes all electronic products.
Test Capability:Specified electrical test centerProfessional testing engineers, perform relevant electrical tests required by Eaton.Test items for cabinet:Mechanical inspectionElectrical A.C mains safety testNormal operation checkMeteringControl function checkCheck alarms visual and relay action(Refer to Config file)Distribution checkFinal inspection